UDC:
69.05
DOI:
10.23968/1999-5571-2017-14-6-254-259
Pages:
254-259
Annotation:
The article identifies the features of selecting construction machines and mechanisms to be used during the assembling of cast-in-situ reinforced concrete frame of high-storey buildings in dense urban development conditions. Two main stages are highlighted in the construction of reinforced concrete frame of high-storey residential buildings, namely, preparatory and basic ones. The key criteria for these stages in terms of constrained production conditions are described (namely, the opportunity of placement of necessary mechanisms, the influence to the location of the existing networks, the influence to the existing buildings, installation of mechanisms in constrained conditions). Evaluation of these factors based on the example of the cranes installation for the construction of reinforced concrete frame of high-storey residential buildings is submitted. In addition, the advantages and disadvantages of stationary concrete pumps and truck-mounted concrete pumps operated in constrained production conditions are described.
Keywords: