Neutralization of work delays based on the analysis of construction schedules formed by the method of undetermined resource coefficients

UDC: 

69.003:658.012.22

DOI: 

10.23968/1999-5571-2022-19-1-48-54

Pages: 

48-54

Annotation: 

The paper presents an analysis of construction work schedules formed by the method of undetermined resource coefficients, on the basis of which variants of possible impacts on the variables are formed in order to reduce the delay of construction. Three groups of variants for the neutralization of the construction work delay are considered, including the quantitative increase in resources, organization of specific resource profiles and technologically permissible works` combination. The obtained results show that the neutralization of construction work delays can be solved by different ways, including combinations of works, which is connected with both decreasing of individual works` duration and also with introducing of negative lags of time.

Authors: 

Bolotin S. A. Saint Petersburg State University of Architecture and Civil Engineering St. Petersburg, Russia

Bohan Kh. A. Saint Petersburg State University of Architecture and Civil Engineering St. Petersburg, Russia

Links to authors' articles: 

Journal Issue