Annotation:
This study presents a calculation of the pessimistic delay in construction during complex development of the territory, based on the establishment of a formalized connection with the pessimistic value of the discount rate. According to the calculated value of the pessimistic delay, it is possible to calculate the delays of all intermediate works based on the use of the linear interpolation method.