Calculation of construction delays in the formation of a pessimistic schedule of work in the project of integrated territory development

UDC: 

338:69:005.511:332.142

DOI: 

10.23968/1999-5571-2023-20-2-56-64

Pages: 

56-64

Annotation: 

This study presents a calculation of the pessimistic delay in construction during complex development of the territory, based on the establishment of a formalized connection with the pessimistic value of the discount rate. According to the calculated value of the pessimistic delay, it is possible to calculate the delays of all intermediate works based on the use of the linear interpolation method.