Annotation:
The article presents the result of analysis of the currently used theoretical approaches and calculation methods of streamline organization of works for the case of erecting a single construction unit. Some theoretical problems of modeling the streamline work organization are considered. There have been developed some basic theoretical provisions of the concept of calculating the work organization parameters using a mathematical model of physical construction stream.