UDC:
338.4
DOI:
10.23968/1999-5571-2017-14-6-302-310
Pages:
302-310
Annotation:
The article presents a methodology for minimizing the risks at implementing investment and construction projects by means of using information technologies. This methodology includes five stages: working out a 3D model of the project, development of the planned project model; synchronization of the design elements of the project with the calendar schedule; formation of the actual and the integrated model for a specific date; systematizing of the data and their analysis, visualization and actualization of the schedule of works; drawing up a report on the construction works progress.
Keywords: