Review article

Economic and mathematical modelfor calculating the effectiveness of ICP implementation while reducing construction time as a result of introducing integrated construction control

UDC: 

332.83

DOI: 

10.23968/1999-5571-2026-23-2-113-120

Pages: 

113-120

Annotation: 

The positions of domestic scientists in the field of determining the effectiveness of investment and construction project (ICP) are considered. There has been developed an economic and mathematical toolk it for assessing the effectiveness of an investment and construction project (ICP) while reducing the construction time as a result of the implementing comprehensive construction control (CCC). The presented development is based on previously described methods for calculating the economic efficiency of projects. After the analysis implementation, it is proposed to focus on the indicators of average annual profit and return on equity. The developed criteria will allow both making decisionson the implementation of CCC and determining the size of optimal investments, which will help determine the direction of future scientific research.

Authors: 

Yadrenkin N. A. Saint Petersburg State University of Architecture and Civil Engineering St. Petersburg, Russia

Links to authors' articles: 

Journal Issue