UDC:
625.7
Pages:
173-181
Annotation:
The paper substantiates typical solutions on the structure, equipment and organization of the pilot-experimental polygons, which is aimed at raising awareness about the state of motor roads and the influence factors, as well as the possibility of increasing the reserve maintenance time periods up to 12 years.
Keywords: